Monday, April 20, 2009

The Bed is Finished!

The bed is finally done, assembled and Hannah in moved back into her room. For those who don't know the story, our neighbor had bought some plans online for a loft bead and built one for each of his kids. When he had finished them, Hannah said she would like one so I set out on the project. I got the list of wood and headed for the local Home Depot. Mark helped me cut all the wood and so all that was left was to sand, stain and assemble. Well that anticipated two weekend project became a 4 1/2 month project. However, it is done and she loves it.

Instead of a desk underneath, Hannah opted to put her bean bag and a book case so that she would have a reading area.

Below is a picture with the room lights out. We put rope lights under the bed for lighting so she could read without having the room lights on. We ended up with a total of 72' of rope lighting.

We also got her a matching dresser ( I didn't build it ) that is upright so it takes up less floor space opening up her room.

1 comment:

Grandma Susan said...

Very good job, Eric! I'm sure Hannah loves it!